                           What Has Been Done




                  IPA-I


                  • The investment of 30 environmental infrastructure
                  projects has been realized.
                  • A pioneering effort was made to invest 704 million
                  Euros.
                  • 7 capacity building projects have been completed


                  During the IPA-I period, the Ministry of Environment,
                  Urbanization and Climate Change pioneered an in-
                  vestment of 704 million Euros, of which approxima-
                  tely 595 million Euros were EU grants and 109 million
                  Euros were national contributions.




                  In this period, a total of 30 environmental infrastructu-
                  re projects were invested in the field of drinking water,
                  wastewater and solid waste management, which were
                  carried out with 44 municipalities in 25 different provin-
                  ces from all regions of the country by the end of 2017.
                  Nearly 9 million people were provided with the oppor-
                  tunity to live in a cleaner environment in line with EU
                  standards through these projects, to which the Ministry
                  of Environment, Urbanization and Climate Change fi-
                  nancially contributed, as well as the EU grant.




                  IPA-II


                  332.4 Million Euros for Environmental and Climate Investments


                  The Ministry of Environment, Urbanization and Climate Change is carrying out 15 Capacity Building Proje-
                  cts, 3 of which are climate projects, within the scope of IPA II.


                    21 environmental and                  With IPA II, which covers a total grant of 361.6 million Euros, of which
                    infrastructure projects               307.4 million Euros are EU grants and 54.2 million Euros are national
                    are carried out with a                contributions, 21 environmental and infrastructure projects are car-
                    total of 47 municipalities            ried out with a total of 47 municipalities in 19 provinces in 6 geog-
                    in 19 provinces in 6                  raphical regions.
                    geographical regions.
                                                          Within  the  scope  of  the  program,  it  is  aimed  to  complete  21
                  environmental infrastructure projects that will serve about 3.2 million people in 18 provinces by 2026.






                    Sorgun, Çarşamba, Şırnak, Kastamonu, Yüksekova, Elbistan, Iğdır, Sivas, Giresun, Çankırı
                    and Doğubayazıt wastewater projects, Trabzon, Bismil, Bandırma, Niksar and Rize water
                    and wastewater projects, KASMİB Solid Waste Project and Hakkari Integrated Solid Waste
                    Project are included in these projects.