Resilient Cities In Turkey For Sustainable
                                      Economic Development

            structures were built in the region where the creek and its bed narrowed. It
            was observed that during the disaster, the first houses to be flooded were
            the ones built in the creek bed. It was also found out that the bridges over
            the Ezine Creek did not have a suitable structure for the region. They were
            built in a flat arrangement rather than in a vaulted formation. Moreover, the
            logs that broke free off the warehouse and ran through the creek blocked the
            bridge, which prevented the water from flowing and the accumulated water
            overflowed and flowed through the district.
               The  Ministry  of  Environment,  Urbanization  and  Climate  Change
            implemented damage assessment operations with a team of 600 people in
            Kastamonu, Bartın and Sinop. The team first identified the regions affected by
            the flood. In Kastamonu, 11.256 independent sections in 2405 buildings in 128
            quarters and villages were found to be damaged. 263 independent sections
            in 104 buildings were found to be destroyed or in need of demolition, and 165
            independent sections in 89 buildings were found to be extremely damaged.
            In Sinop, 9.380 apartments in 2.132 buildings in 4 districts, and 109 quarters
            and villages were examined. 299 independent sections in 188 buildings were
            found to be destroyed or in need of demolition, and 29 independent sections
            in 25 buildings were found to be extremely damaged. In Bartın, Ulus District,
            503 independent sections in 212 buildings in 26 quarters and villages were
            examined. 36 independent sections in 27 buildings were found to be destroyed
            or in need of demolition, and 29 apartments in 19 buildings were found to
            be  extremely  damaged  (Turkish  Ministry  of  Environment,  Urbanization  and
            Climate Change, 2022d).
               After  the  disaster  relief  accommodation  analysis  made  in  Kastamonu,
            Sinop, Bartın the total number of housing unit to be built was found to be
            1473 in total. Most of these buildings are under construction and the tender
            was  determined  to  700  million  Turkish  Liras.  Also,  in  addition  to  housing
            projects, the Ministry of Environment, Urbanization and Climate Change have
            also implemented square and shopping district projects. 4
               Led  by  the  Ministry  of  Interior,  from  the  first  moment  the  flood  hit  the
            region, a tent city of 548 tents were erected in 5 different points, 75 container
            houses, 34 WC and shower containers, 63 office containers were built in order
            to meet the accommodation needs of people when the search and rescue
            and cleaning operations were in progress. Except for the housing operations,
            the total number of cash grants were 647 Turkish Liras, and the tenders invited





            4  The information was gained through interviews with the officials working in the Turkish Ministry
            of Environment Urbanization and Climate Change