The Contribution Of Reuse Of Historical Buildings
For The Urban Resilience: The Case Of Manisa Kurşunlu Han
west of Hatuniye Mosque is the building block including the Yeni Han. The
building block to the west of Yeni Han contains the Şehzadeler Municipality
Building (Figure 1). To the North of Hatuniye Mosque lies the Government Hall
(Kurşunlu Han Restoration Project, Project Contractor UMART Architecture
1
Engineering Construction Industry Contract Co. Ltd. Project Appendix) .
The Plan-Cross-Section-View Features of the Han
As seen in Figure 2 (a-b), the two-floor building has a plan scheme with its
dimensions close to a square (48mx51m). The open courtyard at the center of
the structure is 28mx24m. On the ground floor, there are 36 rooms, and the outer
facades of these rooms contain 21 stores. On the 1st floor, there are 38 rooms.
The construction technique of Kurşunlu Han is coursed rubble masonry.
Consisting of ground and first floors, the structure was built through alternating
brick and stone masonry. The main outer walls of the structure are 0,8 to 1m
thick, ending with dog-tooth course laid in two lines on the edge. The rooms
supported by masonry walls and the stores to the west of the building are
covered by barrel vault ceiling. The ceiling of the north stores are covered
with a mixture of barrel and groin vaults. Kurşunlu Han has a hip roof with dog-
tooth course on the edges. There are domes without cornices on the porch,
and over the rooms, there is a roof with a single declination. To the west, over
the entrance the cantilevered part of the building has a larger dome with a
cornice (Contractor UMART Architecture Engineering Construction Industry
Contract Co. Ltd. Project Appendixes). Figure 3 shows Kurşunlu Han from
various angles before the 2016-2018 restoration (a-b-c-d-e).
Dr. Sadık Ahmet (BORSA) Street
Outer Court
Court
Kurşunlu Han Street
Court
Ground floor plan Anıt Street
a. Ground Floor Plan b. First Floor Plan
1 Kurşunlu Han was rented for 25 years to be restored and used by the Şehzadeler (Manisa) Muni-
cipality with the protocol signed with Izmir Regional Directorate of Foundations on 20.05.2015. To
this end, the tender for the building was issued by Şehzadeler Municipality on 07.06.2016, and the
supervision for the relevant construction work was jointly maintained by Şehzadeler Municipality
and İller Bank Inc. Co. İzmir Regional Directorate. The project and all documents concerning the
restoration were prepared by the Contractor Firm UMART Architecture Engineering Construction
Industry Contract Co. Ltd.