               Currently, there are a total of 135 commercial CCUS facilities designed in
            various sectors, including cement, iron & steel, energy production and direct
            air capture. 28 of them are currently operational. There has been a serious
            increase in the number of CCUS projects. By the end of 2020, the capacity of
            projects under development was 75 Mt/year, which increased by 48% to 111
            Mt/year in September 2021. (GCCSI, 2021b, 2021a). The bar chart displaying
            the  states  of  existing  CCUS  facilities  is  given  in  Figure  6.  Moreover,  Table
            1 shows the locations of these facilities along with their numbers. (GCCSI,
            2021b).